Checking
Automatic
Operation
To check the systemfor proper automatic operation,
proceed as follows:
I.
Check thatAUTO/OFF/MANUAL
is set to OFF.
2.
Apply utility power to the Automatic Transfer Switch
by turning ON the main distribution panel circuit
breaker.
3.
Set the AUTO/OFF/MANUAL
switch to AUTO.The
Automatic Power System is now ready for automatic
operation.
4.
Turn OFF the main distribution panel circuit breaker
sending power to the automatic transfer switch.
The engine will crank and start after sensors have timed
ou_After starting, the Automatic Power Transfer System
will transfer essential circuit loads to the generator. Let the
system go through its entire automatic operation sequence.
5.
With the generator output supplying its loads,turn
ON the main distribution panel circuit breaker that
supplies utility power to the Automatic Power Transfer
Switch.
6.
After about 6 seconds, the automatic transfer switch
wilt transfer loads back to the utiJity power.
7.
About one minute after re-transfer, the generator
will
stop.
This completes
the test procedures for the automatic
operation
of the Home Generator
System.
SETTING
EXERCISE
TIMER
The Home Generator Systemis equipped with an exercise
timer that will start and exercise the system once every
seven days.During this exercise period, the unit runs for
approximately 12 minutes and then shuts down. Electrical
load transfer DOES NOT occur during the exercise cycle
(unless an utility power outage occurs).
A switch on the control panel is labeled"SetExercise" (see
Figure 16).The specific day and the specific time of day this
switch is pressed is programmed into the control board
memory.This date and time is then used to automatically
initiate the system exercise cycle.
To perform
the Set Exercise
procedure:
I.
Choose the day and time you want your Home
Generator System to exercise.
2.
On that day and time, set the AUTO/OFF/MANUAL
switch to OFF.
3.
4.
5.
Press and hold down the "Set Exercise" switch until
the Diagnostic LED turns on (about five seconds).
Press and hold the switch down until the Diagnostic
LED turns off. Releasethe Set Exercise switch.
Set the AUTO/OFF/MANUAL switch to AUTO. "Set
Exercise" is complete.
For example, if you press the "Set Exercise" switch on
Sunday morning at 10:00AM, the unit will run an exercise
cycle the following Sundayat 10:00AM.
NOTE: "Set Exercise"will only work if the unit is in the
Automatic mode and this exact procedure is followed.The
exerciser does not need to be re-set if the I 5 Amp fuse is
removed or changed.The exerciser will need to be re-set if
the 12Volt DC battery is disconnected.
If you want to change the day and time the unit exercises,
simply perform
the "Set Exercise" procedure
at the exact
weekday and time you want it to take place.