Primary Boom; How To Remove The Primary Boom - Genie Z-30/20N Service Manual

Hide thumbs Also See for Z-30/20N:
Table of Contents

Advertisement

Service Manual
Primary Boom Components
How to Shim the Primary Boom
1
Extend the boom until the wear pads are
accessible.
2
Loosen the wear pad mounting fasteners.
3
Install the new shims under the wear pad to
obtain zero clearance and zero drag.
4
Tighten the mounting fasteners.
5
Extend and retract the boom through an entire
cycle. Check for tight spots that could cause
scraping or binding.
Note: Always maintain squareness between the
outer and inner boom tubes.
60
Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N
How to Remove the Primary
How to R emove the Primary Boom
Boom
Bodily injury hazard. This
procedure requires specific repair
skills, lifting equipment and a
suitable workshop. Attempting
this procedure without these skills
and tools could result in death or
serious injury and significant
component damage. Dealer
service is strongly recommended.
Note: Perform this procedure with the boom in the
stowed position.
Note: When removing a hose assembly or fitting,
the O-ring (if equipped) on the fitting and/or hose
end must be replaced. All connections must be
torqued to specification during installation. Refer to
Specifications, Hydraulic Hose and Fitting Torque
Specifications.
1
Remove the platform.
2
Remove the platform rotator. Refer to Repair
Procedure, How to Remove the Platform
Rotator.
3
Remove the jib boom. Refer to Repair
Procedure, How to Remove the Jib Boom.
Models without rotating jib boom: Remove
4
the jib boom bellcrank. Refer to Repair
Procedure, How to Remove the Jib Boom
Bellcrank.
Models with rotating jib boom: Remove the
jib boom rotator. Refer to Repair Procedure,
How to Remove the Jib Boom Rotator.
April 2016
Part No. 139378

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-34/22nZ-30/20n rjZ-34/22dc

Table of Contents