Scheduled Maintenance Procedures; Introduction - Genie Z-30/20N Service Manual

Hide thumbs Also See for Z-30/20N:
Table of Contents

Advertisement

April 2016
Section 3
Schedul ed Mai ntenance Pr ocedures
Observe and Obey:
Maintenance inspections shall be completed
by a person trained and qualified on the
maintenance of this machine.
Scheduled maintenance inspections shall be
completed daily, quarterly, semi-annually,
annually and every 2 years as specified of the
Maintenance inspection Report. The frequency
and extent of periodic examinations and tests
may also depend on national regulations.
Failure to perform each
procedure as presented and
scheduled may cause death,
serious injury or substantial
damage.
Immediately tag and remove from service a
damaged or malfunctioning machine.
Repair any machine damage or malfunction
before operating the machine.
Use only Genie approved replacement parts.
Machines that have been out of service for a
period longer than 3 months must complete the
quarterly inspection.
Part No. 139378

Scheduled Maintenance Procedures

Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N
Machine Configuration:
Unless otherwise specified, perform each
procedure with the machine in the following
configuration:
• Machine parked on a firm, level surface
• Key switch in the off position with the key
removed
• The red Emergency Stop button in the off
position at both the ground and platform
controls
• Wheels chocked
• All external AC power supply disconnected
from the machine
• Boom in the stowed position
• Turntable secured with the turntable rotation
lock
Service Manual
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-34/22nZ-30/20n rjZ-34/22dc

Table of Contents