Mounting Racks
The duct work shown in the following diagram is not used for mounting the
Racks. Although optional, this duct work can be used to house the wires from the
I/O Units that run along the sides of the Racks, keeping the wires from becoming
entangled. This figures illustrate the correct way to mount the Racks.
Input duct
CPU
Rack
Expansion
I/O Rack
Fuses, relays, timers
(Do not install heat-gen-
erating equipment or
power equipment.)
Output duct
200 mm min.
Breakers,
fuses
Power equip-
ment such as
transformers
and magnetic
relays
Terminal
Terminal blocks for
blocks for
power equipment
PC
Section 3-3
Power duct
47