Yamaha FJR1300AS(X) Service Manual page 382

Hide thumbs Also See for FJR1300AS(X):
Table of Contents

Advertisement

2
1
3. Install:
• Front shift arm "1"
Front shift arm bolt
10 Nm (1.0 m·kg, 7.2 ft·lb)
NOTE:
Align the punch mark "a" on the front shift arm
with the punch mark "b" on the shift shaft.
b
1
a
5-77
SHIFT SHAFT

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Fjr1300a(x)

Table of Contents