Preparing the Installation of ETERNUS CS800
Components
Before you begin the installation procedure in
nents" on page
Consider
"Necessary Tools" on page 38
"Taking ESD Precautions" on page 38
"Unpacking the ETERNUS CS800" on page 38

Rack Requirements

Table 1
Height
Width (side to side)
Depth (front to back)
Weight (stand alone)
Air Clearance
Ventilation Clearance
Table 2: Rack Requirements
U41842-J-Z125-1-76
41, make the following preparations as described in this section:
"Rack Requirements" on page 37
contains the rack requirements for the ETERNUS CS800 components.
ETERNUS CS800
without expansion modules
4 HU, 16.0 cm
48.4 cm
77.0 cm
95 kg
Open 4" (10.2 cm) before and behind unit for proper air flow
At least 200 mm on the front and rear
"Installing the ETERNUS CS800 Compo-
with expansion modules
up to 22 HU, 88.0 cm
48.4 cm
77.0 cm
up to 375 kg