Capacity On Demand Activation Procedure; Section 4.6, "Capacity On Demand Activation Procedure - IBM p5 590 System Handbook

Table of Contents

Advertisement

processor days, additional processor capacity can be purchased under IBM CoD
at regular On/Off CoD activation prices. IBM HACMP
software (5765-F62), when installed, can automatically activate Capacity BackUp
resources upon failover. When needed, HACMP can also activate dynamic LPAR
and CoD resources.
Capacity BackUp configurations:
For p5-590: Capacity BackUp POWER5, 32 1.65 GHz POWER5 processors,
28 standby and 4 permanently active, along with 900 On/Off CoD credit
processor days (450 On/Off CoD days per processor book). Select FC 7730
for this function.
For p5-595: Capacity BackUp POWER5, 32 or 64 1.65 GHz POWER5
processors, 28 or 60 standby and 4 permanently active, along with 900 or
1800 On/Off CoD credit processor days (450 On/Off CoD days per processor
book). Select FC 7731 for this function.
For p5-595: Capacity BackUp POWER5, 32 or 64 1.9 GHz POWER5
processors, 28 or 60 standby and 4 permanently active, along with 900 or
1800 On/Off CoD credit processor days (450 On/Off CoD days per processor
book). Select FC 7732 for this function.

4.6 Capacity on Demand activation procedure

The p5-590 and p5-595 servers use an encrypted code to activate CUoD,
Reserve CoD, and Trial CoD resources as well as to enable On/Off CoD. The
activation process for IBM Sserver p5 CoD systems is quick and easy. The
client simply places an order for a specific CoD feature code and supplies the
necessary system configuration data. The HMC order selection panel shown in
Figure 4-1 is used to facilitate order placement.
V5 and HACMP/XD
Chapter 4. Capacity on Demand
91

Advertisement

Table of Contents
loading

This manual is also suitable for:

P5 595

Table of Contents