Removal Of The Pcb - Daikin FVXS25FV1B Service Manual

Inverter pair floor standing type
Hide thumbs Also See for FVXS25FV1B:
Table of Contents

Advertisement

SiBE06-708
1.4

Removal of the PCB

Procedure
Step
1. Removing the shelter.
1
Undo the 8 hooks from
the side flame-proof
plate to remove the
plate.
2. Removing the sensor
PCB.
Undo the 2 hooks.
1
2
Disconnect the
connector S49 and
remove the sensor
PCB.
Removal Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Hooks
Hooks
Side shelter
Hooks
(R6788)
Hooks
(R6794)
Connector
S49
(R6789)
Indoor Unit
Points
155

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents