Unpacking; Shrink Wrap - GBC TITAN 110 Operation & Maintenance Manual

Hide thumbs Also See for TITAN 110:
Table of Contents

Advertisement

Titan 110/ 165 Operation and Maintenance Manual

4.3 Unpacking

INFORMATION
A L L S H I P M E N T S A R E E X - W O R K S . At our
dock, title passes to the buyer. Please review
your insurance coverage prior to shipment,
as you are responsible for all subsequent
freight charges and risks.
INFORMATION
Before signing the Bill of Lading, you should
be sure to inspect the crate and / or pallet
for signs of damage or missing items; if
applicable, make note of this on the Bill of
Lading.
IN F O R M A T IO N
D epen ding on th e d estin ation an d custom er
p referen ce, th e T itan 110/ 165 m ay be
shipp ed in various w ays. T h e lam in ator
m ay arrive sh rin k w rapp ed or in a
p lyw ood crate on a sk id. Please follow
the un pack ing p roced ure th at pertain s
to you r m ethod of ship m en t.
With regards to your shipping methods, use one
of the following procedure described to safely and
properly unwrap / uncrate your laminator.
© GBC Films Group November 2000
4.4 Shrink Wrapped
a) Inspect the machine for any obvious shipping
damages upon receipt.
b) Carefully unwrap the shrink wrap from around
the laminator.
Do not use a knife or other sharp object to
remove the shrink wrap from around the
laminator. You can cause irreparable
damage to the rollers.
c) With another person, carefully wheel your
Titan 110/ 165 Laminator to the installation site.
Do not attempt to move the laminator across
anything other than a flat level surface
without trained and qualified riggers. You
can be crushed or seriously injured.
Installation
CAUTION
WARNING
Page 4 - 7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Titan 165

Table of Contents