In-Wall - Minimum Combustible Facing Clearances - Heatilator ION-V7 Installation Manual

Hide thumbs Also See for ION-V7:
Table of Contents

Advertisement

18. Have a qualified service technician make the connec-
tions to gas and electric service.
WARNING! Risk of Fire or Explosion! Gas and electric
connections should be performed by a qualified service
technician.
19. Gas line holes and other openings should be caulked
or sealed.
(VIEW SHOWN WITH
FINISHING STRIPS)
HOOD CLIP DETAIL
PROPER INSTALLATION OF HOOD CLIPS
(VIEW SHOWN WITHOUT FINISHING STRIPS)
Figure 11.5 Finishing Strip Attachment & Proper Hood Clip
Installation
TOP VIEW
VERTICAL
2 X 6 STUDS
2 X 6 HEADER
TUB ASSEMBLY
BEFORE
AFTER
TOP VIEW WITH
TUB INSTALLED
INSULATION ZONE
2 IN.
TUB ASSEMBLY
Figure 11.6. In-Wall Tub Installation - Top View
54
FINISHING STRIPS
3-1/2 IN.
Heatilator • ION-V7, ION-S7, ION-H7 Installation Manual • 2276-980 Rev. E • 5/15
B. In-Wall - Minimum Combustible Facing
Clearances
A
ION-V7
20-1/8 in.
ION-S7
29-3/8 in.
ION-H7
39-3/8 in.
WALL - FRAMED AND SHEETROCKED
1-1/2 IN.
A
D
*3/4 IN. MIN.
TOP
C =4 IN. MIN.
Figure 11.7. In-Wall Tub Installation - Sheet Rock Facing
Figure 11.8. In-Wall Tub Installation - Sheet Rock Thickness
D
43-7/8 in.
41-1/4 in.
39-3/4 in.
NON-COMBUSTIBLE
BOARD
SHEET ROCK
1/2 INCH MAX.
THICKNESS
* = 3/4 IN. OF STUD IS
EXPOSED FOR
MOUNTING 1/2 INCH
NON-COMBUSTIBLE
BOARD
NON-COMBUSTIBLE
BOARD
FINISHED FLOOR
1/2 IN. MAX.
THICKNESS

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ion-s7Ion-h7

Table of Contents