Suzuki RM-Z250 Owner's Service Manual page 147

Hide thumbs Also See for RM-Z250:
Table of Contents

Advertisement

8-6
KICK STARTER
• Install the spring 7 to the kick starter shaft.
• Install the kick starter shaft assembly to the crankcase.
NOTE:
Securely engage the stopper portion E of the kick starter with
the stopper guide F.
• Install the end of return spring to the crankcase.
• Install the kick starter idle gear 8.
• Reassemble the clutch assembly. (!7-8, -9)
• Install the dowel pins and gasket 9.
Use a new gasket 9 to prevent oil leakage.
• Install the right crankcase cover 0.
# Right crankcase cover bolt: 11 N·m (1.1kgf-m, 8.0 lb-ft)
CAUTION

Advertisement

Table of Contents
loading

Table of Contents