Xerox Document Workcenter 150 Service Manual page 25

Table of Contents

Advertisement

3.
Access lhe
CNl connector on the main
PWB.
Plug in the machine.
The voltages ere correct.
Y
N
1
Go to step 5.
POWER
CORD
4.
Perform RAP 15.
5.
Unplug the machine and disconnect
CNl
from the main PWB. Plug in the machine.
Measure the voltages at CN2 on the power
SUPPlY.
The voltages ere correct.
i
N Replace the Power Supply (REP 6.4).
6.
Reler to the DC Power Oistribution drawings
in Section 7. Determine which componenl
was loading the power supply.
POWER SUPPLY PL 6.1
REGULATORS
CNZ
CN2
CNI
CNI
1 1
+42 VDC
+42 VDC
1 1
2 2
t42 VDC
t42 VDC
2 2
3 3
DCGND
DCGND
-2 -2
4 4
DC GND
DC GND
4 4
5 5
+5 VDC
+5 VDC
5 5
6 6
+5 VDC
+5 VDC
6 6
7 7
DC GND
DC GND
7 7
6 6
DCGND
DCGND
6 6
9 9
+I2 VDC
+I2 VDC
9 9
IO IO
DC GND
DC GND
10 10
11 11
-12 VDC
-12 VDC
11 11
12 12
DC
DC
GND
GND
12 12
I
I
Document WorkCenter 150
5196
2-5
RAP 10 Input Power

Advertisement

Table of Contents
loading

Table of Contents