Unpacking The Cables; Assembling The Frame - Precor TRM 800 Series Assembling And Maintaining Manual

Table of Contents

Advertisement

20

Unpacking the Cables

To connect the console to the base unit, you may need up to
four cables, as follows:
The first three of these cables are shipped with the console or
PVS. The base unit data cable is shipped inside the treadmill
fairing.
Note: The PVS does not include an Ethernet cable.
To unpack the cables:
1.
2. Remove any tapes that secure the cables, then unwind

Assembling the Frame

DANGER
Each of the upright supports on this treadmill has two internal
channels: one to provide structural support and one to
contain the cables. The following figure shows the location of
the cable channel in each upright support.
Figure 2: Cable channel location
Assembling and Maintaining TRM 800-Series Treadmills
Ethernet (P80 only)
Television (P80 or PVS)
Power (P80 or PVS)
Base unit data
Open the box containing the P80 console or PVS. Retrieve
the Ethernet, television, and power cables.
them and remove any kinks. Gather the cables into a
bundle (referred to later in this manual as the console
cable assembly).
Make sure that the treadmill is not connected
to any power source before you begin the
following procedures.

Advertisement

Table of Contents
loading

Table of Contents