1MRK 505 293-UUS A
1.3.2
1.3.3
Commissioning manual
during the testing phase. The manual provides procedures for the checking of external
circuitry and energizing the IED, parameter setting and configuration as well as verifying
settings by secondary injection. The manual describes the process of testing an IED in a
substation which is not in service. The chapters are organized in the chronological order
in which the IED should be commissioned. The relevant procedures may be followed also
during the service and maintenance activities.
The operation manual contains instructions on how to operate the IED once it has been
commissioned. The manual provides instructions for the monitoring, controlling and
setting of the IED. The manual also describes how to identify disturbances and how to
view calculated and measured power grid data to determine the cause of a fault.
The application manual contains application descriptions and setting guidelines sorted per
function. The manual can be used to find out when and for what purpose a typical
protection function can be used. The manual can also provides assistance for calculating
settings.
The technical manual contains application and functionality descriptions and lists
function blocks, logic diagrams, input and output signals, setting parameters and technical
data, sorted per function. The manual can be used as a technical reference during the
engineering phase, installation and commissioning phase, and during normal service.
The communication protocol manual describes the communication protocols supported
by the IED. The manual concentrates on the vendor-specific implementations.
The point list manual describes the outlook and properties of the data points specific to the
IED. The manual should be used in conjunction with the corresponding communication
protocol manual.

Document revision history

Document revision/date
-/March 2013
A/October 2016

Related documents

Documents related to REQ650
Application manual
Technical manual
Commissioning manual
Product Guide
Type test certificate
Application notes for Circuit Breaker Control
History
First release
Minor corrections made
Section 1
Introduction
Identity number
1MRK 505 291-UUS
1MRK 505 292-UUS
1MRK 505 293-UUS
1MRK 505 294-BUS
1MRK 505 294-TUS
1MRG006806