Section 6 Establishing Connection And Verifying The Spa/Iec Communication; Entering Settings; Entering Spa Settings; Entering Iec Settings - ABB REQ650 Commissioning Manual

Relion 650 series, breaker protection
Hide thumbs Also See for REQ650:
Table of Contents

Advertisement

1MRK 505 385-UEN A
Establishing connection and verifying the SPA/IEC communication
Section 6
6.1
6.1.1
6.1.2
Breaker protection REQ650 2.2 IEC
Commissioning manual
Establishing connection and verifying the
SPA/IEC communication

Entering settings

If the IED is connected to a monitoring or control system via the rear SPA/IEC103
port, the SPA/IEC103 port has to be set either for SPA or IEC103 use.

Entering SPA settings

The SPA/IEC port is located on the rear side of the IED. Two types of interfaces
can be used:
plastic fibres with connector type HFBR
glass fibres with connector type ST
When using the SPA protocol, the rear SPA/IEC port must be set for SPA use.
Procedure:
1.
Set the port for SPA use on the local HMI under Main menu /
Configuration /Communication /Station communication/Port
configuration/SLM optical serial port/PROTOCOL:1. When the
communication protocol is selected, the IED is automatically restarted, and
the port then operates as a SPA port.
2.
Set the SlaveAddress and BaudRate for the rear SPA port on the local HMI
under Main menu/Configuration/Communication/Station
communication/SPA/SPA:1. Use the same settings for these as is set in the
SMS system for the IED.

Entering IEC settings

The SPA/IEC port is located on the rear side of the IED. Two types of interfaces
can be used:
plastic fibres with connector type HFBR
glass fibres with connector type ST
When using the IEC protocol, the rear SPA/IEC port must be set for IEC use.
Procedure:
Section 6
M11735-2 v2
M11735-7 v5
M11735-32 v5
45

Advertisement

Table of Contents
loading

Table of Contents