Installation In A Base Unit - Miele DGC 6500 Operating And Installation Instructions

Table of Contents

Advertisement

Building-in dimensions

Installation in a base unit

The furniture housing unit must not have a back panel fitted behind the
building-in niche.
When building the appliance into a base unit underneath a hob please also
observe the installation instructions for the hob as well as the building-in depth
required for the hob (see installation instruction manual for the hob).
a Steam oven
b Niche
c Inlet for mains connection cable to the appliance
d Recommended position for electrical socket. Important: Do not position behind
the appliance.
e Mains connection cable
* Glass front / ** metal front
170

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgc 6600Dgc 6660 mk

Table of Contents