Control Board - England's Stove Works Smartstove 25?SSP01 Installation & Operation Manual

Hide thumbs Also See for Smartstove 25?SSP01:
Table of Contents

Advertisement

 
Control Board 
*BEFORE REPLACING THE CONTROL BOARD BE SURE THE UNIT IS COOLED COMPLETELY AND 
UNPLUGGED.* 
The Control Board (Part # 25‐SSCB) is a digital read‐out board.  To replace the control board, first unplug 
the power cord from the wall outlet.  Remove the front face of the control board by pulling it forward.  Once 
the board is apart, use a pair of needle nose pliers to disconnect the wiring harness, room sensor, heat sensor, 
hopper lid and vacuum switch connectors.   
When connecting the new board, reconnect the components mentioned above and snap the front face of 
the control panel back into place.  Reconnect power when ready to use the unit.   
 
 
Recommended Heat Ranges (For Manual Mode): 
Low Burn: 
Medium Low:   
 
 
Medium High:  
 
High Burn: 
 
 
 
 
* NOTE:  Blower Speed will automatically be adjusted to the desired Heat Range that you 
 
select. 
 
 
 
 
 
 
 
 
 
 
IMPORTANT!  READ AND FOLLOW ALL INSTALLATION AND MAINTENANCE INSTRUCTIONS, INCLUDING CLEANING THE UNIT AS SPECIFIED, AND 
ENGLAND'S STOVE WORKS IS NOT RESPONSIBLE FOR ANY DAMAGE OR INJURY INCURRED DUE TO NEGLECT, OR DUE TO UNSAFE INSTALLATION OR 
 
 
REPLACING COMPONENTS 
 
Heat Range setting:  1   
Heat Range setting:  2 – 3 
Heat Range setting:  4 – 8 
 
Heat Range setting:  9   
Note: The overlay on your unit may vary in appearance. 
REPLACING GASKETS ANNUALLY, AND PARTS AS NEEDED. 
USAGE OF THIS PRODUCT. CALL TECHNICAL SUPPORT WITH ANY QUESTIONS. 
 
Room Air Blower setting:  1 
 
Room Air Blower setting:  * 
 
Room Air Blower setting:  * 
 
Room Air Blower setting:  9 
 
 
39 
 

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents