Finalizing the Installation

Steps for Finalizing the Installation

1. Remove the glass frame (see page 49).
NOTE:
If using propane (LP) convert the appliance at this time (see page 57).
2. We recommend you purge the gas line at this time (with the glass removed). This allows
gas to be detected once it enters the firebox, ensuring gas does not build up.
3. Make sure all six accent lights operate properly. Remove the glass tray, if necessary, to
access the accent light bulbs (see page 57 for glass tray removal).
NOTE: .Take care to not touch the bulbs with your fingers – use a cloth or paper towel).
4. Install the four AA batteries (see illustration below). The AA batteries act as a power backup
in case the household (AC) power goes out and are required for operation.
AAA batteries into the remote (see illustration below). Synchronize the transmitter to the
IFC (see owner's manual for additional details).
5. Install the firebacks (see page 52). Install the crushed glass (see page 52).
6. Replace the glass frame.
7. Start the heater.
8. Leak test all gas joints.