Operation - EIP TRITON Owner's Manual

Triton industrial dehumidifier
Table of Contents

Advertisement

The following procedures should be followed to test the Triton for correct

operation:

1.
After unpacking, examine all external features to confirm damage-
free shipment. Report all defects and damage at once. Connect the
power cable to a grounded 15 Amp electrical outlet.
2.
Check dehumidification process as follows:
DO NOT REMOVE COVERS WHEN UNIT IS IN OPERATION
A. Place unit on a level surface.
B. Start up unit by switching to "ON".
C. Check that air is being delivered through the front outlet grille
and the compressor is running.
D. Leave the machine running for 60 minutes.
E. Check to ensure there is sign of water extraction through the
condensate drain.
F. Test the pump surge system operation by holding the
momentary pump switch for 5 to 10 seconds. This switch allows
you to drain the pump reservoir at the end of a drying job
If, after carrying out the above procedures, the unit does not appear to
function properly, refer to the Troubleshooting section, which follows,
or contact the Factory Service Center.
ONCE THE UNIT HAS BEEN SWITCHED OFF, WAIT AT
LEAST FIVE MINUTES BEFORE RESTARTING.
OPERATION
CAUTION:
CAUTION:
Page 5 of 16
Drawing : - TPC224
Issue
: - 7
Date
: - 10/12/13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents