Theory of Operation Ver. 2.0 Nov. 2007
23.3 Parts operated when the main power switch is turned ON
23.3.1
Parts operated when the main power switch is turned ON
• When the Main power switch is turned ON, MFP board detects it and sends a control sig-
nal to the DC power supply through the printer control board.
• The DC power supply then supplies 3.3 V DC, 5V DC, 12V DC, 15 V DC, and 24 V DC to
all boards and options. It also turns ON the relays in the PWBs, preparing AC power
ready to be supplied to each heater lamp.
Main power switch
NOTE
• When turning OFF, then ON the main power switch, turn OFF the main power
switch and wait for 10 sec. or longer before turning it ON again. The period of 10
sec. or longer is required for properly incorporating in the machine the setting
changes made using the service mode or other function.
23. Other control
A02ET2C907AA
123