Figure 2.12 Mounting 2Bm/4Tm On The Base Board; Figure 2.13 Mounting 2Dm/4Dm/4Sm/4Lm On The Base Board - Samsung OfficeServ 7030 Installation Manual

Hide thumbs Also See for OfficeServ 7030:
Table of Contents

Advertisement

CHAPTER 2. Mounting and Replacing the Boards
1) 2BM or 4TM can be mounted to the base board's P3 connector.

Figure 2.12 Mounting 2BM/4TM on the Base Board

2) 2DM, 4DM, 4SM or 4LM can be mounted to the base board's P1 and P4 connector.

Figure 2.13 Mounting 2DM/4DM/4SM/4LM on the Base Board

10
© SAMSUNG Electronics Co., Ltd.

Advertisement

Table of Contents
loading

Table of Contents