Vertical Through-The-Roof Applications & Installation - Majestic 33LDVR Installation Instructions And Homeowner's Manual

Builder rear vent direct vent
Table of Contents

Advertisement

LDVR Series Direct Vent Gas Fireplace
Zero Clearance
Sleeve
(if required)
Firestop
7" Pipe
24" (610mm)
Minimum*
Fig. 33 Below grade installation.
Do not back fill around snorkel. A clearance
of at least 4" (102mm) must be maintained
BG400
between the snorkel and the soil.
Below grade installation
2/10/99 djt
10/19/99 added standoffs
Foundation Recess
Recess Brackets
Watertight Seal
Around Pipe
Fig. 34 Snorkel installation, recessed foundation.
BG401
If the foundation is recessed, use recess brackets (not
supplied) for securing lower portion of the snorkel. Fasten
Snorkel
brackets to wall first, then secure to snorkel with self drilling
2/10/99 djt
#8 x 1/ sheet metal screws. It will be necessary to extend
vent pipes out as far as protruding wall face. (Fig. 34)
0
7TDVSNORK
(Snorkel)
4" (10mm)
Clearance
Min.
Window
Well
Gravel
Drain
Foundation Wall
*A minimum of 4" (608mm) ver-
tical pipe must be installed when
using 7TDVSNORK Kit.
BG400
Snorkel
Wall Screws
Sheet Metal
Screws
BG401
Vertical Through-the-Roof Applications
This Gas Fireplace has been approved for:
1. Vertical installations up to 40' (1 m) in height. Up to
10' (3 m) horizontal vent run can be installed within the
vent system using a maximum of three 90° elbows.
Minimum
8' (.4 m) /
Maximum
40' (1 m) Vertical
Rise
Fig. 35 Support straps for horizontal runs.
CFM148
This Gas Fireplace has been approved for:
1. Vertical installations up to 40' (1 m) in height. Up to
10' (3 m) horizontal vent run can be installed within the
vent system using a maximum of three 90° elbows.
. Up to two 45° elbows may be used within the horizontal
run. For each 45° elbow used on the horizontal level
the maximum horizontal length must be reduced by 18"
(457 mm).
Example: Maximum horizontal length
0 x 45° elbows = 10' (3 m)
1 x 45° elbows = 8¹⁄₂' (.6 m)
 x 45° elbows = 7' (.1 m)
3. A minimum of an 8' vertical rise.
4. Two sets of 45° elbows offsets within these vertical
installations. From 0 to a maximum of 8' (.4 m) of vent
pipe can be used between elbows. (Fig. 36)
5. 7DVCS must be used to support offsets. (Fig. 36) This
application will require that you first determine the roof
pitch and use the appropriate 7DVSKV (A, B or F).
(Refer to Venting Components List, Page 3)
Maximum
10'
(3 m)
Pipe Straps Every 3'
(914 mm)
CFM148
10007317

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

36ldvr43ldvr39ldvr

Table of Contents