4 Setting the start up pressure
If necessary, the start-up pressure can be set on the right valve (1st
stage) using a flat screwdriver.
In the factory, it is set to maximum..
Start-up pressure
Recommended position
The progressivity of the left valve (2nd stage) is always set to
"Minimum".
No setting is needed on the left valve on a 14-element boiler.
16
Natural gas
Natural gas H
11 mbar
between "Mini" and "Maxi" (1/4
"Maxi"
Remeha Gas 360 S
1/4 turn
Propane
or
To modify this setting, it necessary first to remove the protection
using a screwdriver (1/4 turn).
Propane
10 mbar
turn)
20/07/05 - 300005180-001-A