BEFORE SWITCHING THE APPLIANCE ON
Before applying power to the unit for the first
time, check for the following conditions:
1. All electrical safety provisions have been ad
hered to and the electrical connections are
correct.
2. Water is connected, turned on and all of the
connections are water tight.
NOTE: The first time the unit is turned on, or
after the unit has been OFF for 5
hours and then turned on, it will auto
matically flush the steam generator
for a period of 75 seconds. The steam
generator will then fill to the proper
water level. The unit is now ready for
operation.
B
A

Final Check and Adjustments

DOOR ADJUSTMENT
The door catch may be adjusted in two direc
tions, in and out, and up and down, using the fol
lowing procedure:
1. Adjust catch up and down by loosening the
two bolts holding the catch to the face of the
unit (A).
2. Make adjustments so that the leading face
of the catch is centered in the opening of the
handle assembly.
3. Tighten the bolts so that there is no further
movement.
4. Adjust catch in and out by loosening the bolt
on the top of the catch (B).
5. The adjustment face is stepped so that
movement is limited with the bolt tightened
properly.
6. The adjustment is correct when the door
closes firmly and no steam leaks from the
gasket.
The hinges can also be adjusted as follows:
1. Be certain the catch is adjusted properly.
2. Adjust hinges so that the door back and the
unit face are parallel (C).
3. The adjustment is correct when no steam
leaks through the gasket.