Idler Roller Take Up Bearings - Toro ProPass 200 Service Manual

Hide thumbs Also See for ProPass 200:
Table of Contents

Advertisement

Idler Roller Take Up Bearings

RIGHT
FRONT
5
1. LH conveyor frame assembly
2. Conveyor bed assembly
3. RH conveyor frame assembly
4. Floor conveyor belt
5. Idler roller
6. Drive roller
7. Scraper assembly
To remove and replace the idler roller take up bearings,
removal of the left side conveyor frame and the floor
conveyor belt is necessary. Once these items are re-
moved, access to the left side take up bearing is pos-
sible. The idler roller needs to be removed from the right
side take up bearing before the right side bearing can be
removed from the frame.
Chassis
3
12
14
15
19
18
16
14
17
Figure 13
8. Cap screw (4 used)
9. Flat washer (8 used)
10. Lock nut (4 used)
11. Flange head screw (10 used)
12. Flange nut (10 used)
13. Tensioner rod
Page 5 - - 14
4
6
2
11
13
14
15
Loctite #242
14. Jam nut
15. Flat washer
16. Take up bearing
17. Locking collar
18. Set screw
19. Grease fitting
7
8
9
9
10
1
ProPass 200

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents