42
6
11
1
FIGURE 17
STEP 17:
• Screw the threaded end of the 112-3/4" LOW ROW CABLE (11) into threaded housing on the base of
BENCH FRAME (1) and tighten jam nut securely.
• Slide the SHROUD (42) between the TOWER (6) as shown in FIGURE 17.
• SECURELY tighten the bolts of the PULLEY BLOCK ASSEMBLY.
1/2
1/2
1/2
1/2
1/2
1/2
0
1
2
3
4
5
6
14