Side Panels, Boiler Control System - eta SH Installation Manual

Log boiler 20-60 kw
Table of Contents

Advertisement

Installation
Install left and right side panels
Attach the side panels to the rear side of the boiler
with 6 M5 X 10 round-headed screws.
Attach the side panels to the front side of the boiler
with 4 M5 X 10 round-headed screws.
Place insulation on top of boiler
Place the largest piece of insulation in the middle
of the boiler's top side.
Attach boiler control system to door frame
Loosen both M8 long nuts on the inner side of the
door frame. Place the boiler control system on the
boiler and remove the cable ties. Fasten the boiler
control system to the door frame with the long
nuts.
SH Montage

Side panels, boiler control system

33
2012-11

Advertisement

Table of Contents
loading

Table of Contents