eta SH Installation Manual page 42

Log boiler 20-60 kw
Table of Contents

Advertisement

Cleaning lever for turbulators
Connect control panel earthing to insulation door
Lay the insulation door on the pallet with the inner
side facing down.
Connect the control panel's earthing cable to the
top side of the insulation door.
Install cover on control panel
Screw the cover onto the control panel with 6 self-
tapping 3.5 x 9.5 screws.
Attach control panel to insulation door
Place the control panel on the insulation door.
Fasten it with 4 M5 x 10 round-headed screws.
Insert door handle
The door handle must be installed on the side
opposite the hinges.
Insert the door handle at an angle into the opening
at the base of the control panel.