Minimum clearances for maintenance

Minimum clearances for maintenance for SH
The adjacent sketch shows the space requirements
and clearances for maintenance and installation of
the boiler.
The dimensions in parentheses apply for 40, 50
and 60 kW boilers.
On one side, left or right, the boiler needs 800 mm
of clearance for maintenance, so it can also be set
up in a mirror image of the sketch.
Will an SH-P boiler be installed
for a TWIN burner?
If a TWIN auxiliary boiler for pellets might
be installed later, the additional space it
will need must be taken into account when
setting up the SH boiler.
The sketch shows a boiler with right-hand
pellet burner; for a left-hand pellet burner
a mirror image applies.
26
>200 mm
Mirror image for TWIN to the left
SH-P
20 - 30 kW
> 400 mm
www.eta.co.at
> 300 mm
610 (710) mm
SH 20-60 kW
> 800 mm
> 500 mm
TWIN 20/26
610 mm
686 mm