eta SH Installation Manual page 43

Log boiler 20-60 kw
Table of Contents

Advertisement

Installation
Attach door handle
Fasten the door handle with 2 M5 x 10 round-
headed screws.
Install insulation door on boiler
Hang the insulation door on the hinges and secure
it with the hinge pins.
Install cable chain on boiler
Insert the cable chain behind the cover
and fasten the end of the chain to the circuit board
with 2 self-tapping 3.5 x 9.5 screws.
Screw cover onto door frame
Attach the cover to the door frame on the side
opposite the cable chain with a self-tapping 3.5 x
9.5 screw.
SH Montage
Cleaning lever for turbulators
2012-11
43

Advertisement

Table of Contents
loading

Table of Contents