Panel On Top Side Of Boiler - eta SH Installation Manual

Log boiler 20-60 kw
Table of Contents

Advertisement

Installation
Close all cable ducts
Lay all cables in the cable ducts and close the
covers of the cable ducts.
Install panel on top of boiler
Place the panel on top of the boiler and fit it to the
door frame at the front.
Screw both M5 x 10 round-headed screws into the
door frame (do not tighten yet).
Fasten the panel to the rear of the boiler with 3
round-headed M5 x 10 screws and the galvanized
brackets on the side panels.
Tighten the two round-headed screws in front
on the door frame.
Adjust insulation door
The separation between the insulation door and
the door frame can be adjusted by turning the
magnets so that the door closes properly.
SH Montage

Panel on top side of boiler

2012-11
45

Advertisement

Table of Contents
loading

Table of Contents