Baffle Installation And Brick Notes - Osburn 2200 Owner's Manual

Osburn 2200 wood stove insert
Hide thumbs Also See for 2200:
Table of Contents

Advertisement

C
: O
AUTION
PERATION
H
T
AZARDOUS
EMPERATURE
Contact your local, municipal, state, or provincial fire authority for information on how to handle a
chimney fire before there is any chance that it may happen.
Creosote – Formation And Need For Removal
When wood (especially green wood) is burned without adequate heat or air supply, it produces tar and
other organic vapours (smoke), which combine with expelled moisture to form creosote.
The creosote vapours condense in the relatively cool chimney flue of a slow-burning fire. As a result,
creosote residue accumulates on the flue lining. When ignited, this creosote makes an extremely hot
fire, which could be hazardous. Check frequently for creosote build-up. In the event of a insert or
chimney component failure, replace only with equipment that is equivalent to the original, available
from your Osburn dealer.
Your Osburn insert has been designed to reduce the amount of creosote produced. Even so, the chimney
connector pipe and chimney should be inspected at least once every two months during the heating
season to determine if a creosote build-up has occurred. If creosote has accumulated, it should be
removed to reduce the risk of chimney fire. Call a professional chimney sweep, or go to your local
Osburn dealer and purchase a chimney brush, and have the chimney cleaned.

4.4 Baffle Installation and Brick Notes

(see Figure 4.1)
1.
The following items are shipped inside the firebox: five full bricks, five cut bricks, rear baffle
support, front baffle support and stainless steel air tube c/w cotter pin, and two baffle boards.
2.
Install rear baffle support, locating on baffle support tabs welded to side plenums.
3.
Install five cut bricks starting with outermost bricks first (4" dimension goes front to rear). Push
rear baffle support towards rear of firebox.
4.
Install baffle boards above secondary air tubes.
5.
Install front baffle support/extension, ensuring extension fits between front risers.
6.
Install five full bricks, starting with outermost bricks first. See Figure 4.1.
7.
Ensure baffle boards are located as per Figure 4.1.
8.
Install secondary air tube ensuring air holes face forward. Install cotter pin as per Figure 4.3.
9.
Remove in reverse order.
O
Y
O
2200 W
F
OUR
SBURN
C
A
ONDITIONS
ND
T
B
ITHOUT
HE
AFFLE
W
V
T
W
ILL
OID
HE
ARRANTY
M
C
U
AY
AUSE
NSAFE
.
A
ND
/19

Advertisement

Table of Contents
loading

Table of Contents