UPS input and output connection
Minimum 10AWG copper wires for input/output & battery cables are required for the
6KVA, and 8AWG for 10KVA.
1) Switch off all breakers before connecting cables
2) Remove the cover of the terminals, see Fig 2-3,and follow it to connect the
cables
CAUTION
Terminators are required so as to ensure the connections are firm
Don't reverse the input L and N
Don't connect the UPS input to a wall outlet or the outlet will get burnt.
3) Connect the UPS output L, N, E to the L, N, E of the load via a PDU. Tighten the
screws and shelter the terminals
WARNING
Please connect the output Earth well before go for other operation.
Connection of the UPS communication cables
1)
The USB cable provided in accessories can be used to connect the UPS with PC
2)
Follow steps below to install SNMP (if purchased )
A. Remove the cover of SNMP slot at UPS rear panel and keep it for further use.
B. Insert the SNMP card and tighten the screws
C.
Connect the UPS with internet by network cable.
D. Refer to the SNMP manual provided to do SNMP setting
Fig.2-2I/O terminals connection