SHERCO 2013 SE 250i-R Shop Manual page 20

Table of Contents

Advertisement

Valve timing:
Verify that tool number 1819 is still
properly installed.
Install the intake cam.
Install the exhaust cam.
(see the photo for how to set the timing marks)
Install the camshaft retaining clips.
Apply moly disulfide grease to the
camshafts.
IN (Admission)
The timing marks should align with the joint
19/54
EX (Echappement)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2013 se 300i-r2011 se 2.5i-f2011 se 3.0i-f

Table of Contents