Epson Stylus Photo RX 560 Service Manual page 50

Hide thumbs Also See for Stylus Photo RX 560:
Table of Contents

Advertisement

EPSON Stylus PHOTO RX560/580/590
4.
After checking the following conditions, tighten the screws in the order specified.
(See Figure 4-21)
The right and left openings at the front bottom of the Middle Housing are properly
engaged with the projections of the Bottom Housing. (Fig. 4-25)
The power supply harnesses (black and yellow) are fastened properly. (Fig.
4-25)
(Held down with the Middle Housing and free from floating or dislocation)
5.
Install the Front Frame Ground Plate on the Middle Housing. (Fig. 4-26)
6.
(See
p.48
for the subsequent steps.)
Route the Waste Ink Tube with the red line always facing up so
that the tube is free from distortion. And with the tube passed
through the hook as shown in the figure, install the Waste Ink
Tray Assy. (Fig. 4-27)
In Stylus PHOTO RX560/580/590, there is a difference between
the Hinge Assy to be installed on the right side and that to be
installed on the left side. Be sure to install the Hinge ASSY B
(longer) on the left side.
~Front left~
Power supply harness
Projection
Hook
Figure 4-25. Checking the installation of the Middle Housing
Disassembly and Assembly
(Fig. 4-20)
~Front right~
Projection
Removal of Exterior Parts
In contact with the
Front Frame
Figure 4-26. Installing the Front Frame Ground Plate
Always with red line facing up
Route here
Pass the tube
through this hook
Figure 4-27. Notes on Installation of the Waste Ink Tray Assy
Revision A
Front Frame Ground Plate
Slide toward the
front to fix it
NG
Do not pass the tube
through this hook
50

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stylus photo rx 590Stylus photo rx 580

Table of Contents