Datsun 1968-1973 510 Owners Workshop Manual page 213

1968-1973 datsun 510; pl 521 pick-up
Table of Contents

Advertisement

212
Chapter
11
Suspenslon
and
steering
23
Finally
check
the
sector
shaft
and bush
for
wear
and
correct
alignment
24 When
all
new
pam
and
new
seals
and gaskets have
been
obtaIned
reassembly
can commence
25 FIt the
ball
nut
onto
the
worm so
that
the
ball guIde
holes
ere
uppermost
26
Carefully
Insert
18 ball
beanngs
Into
each of the two
holes
In
the
same
SIde
as
the
nut
As
the
ball
bearings
are
beIng
Inserted
slowly
turn
the
worm
away from
the
holes untol all
36 have
been
fitted
27 Should the
SItuatIon
arise
so
that the
ball
bearings
are
stopped by the end
of
the column try uSIng
a
metal rod to
hold
down the ball
bearings
that have already
been
fItted
and
care
fully
rotate
the
column
In
the
opposite dIrectIon
untol
the
pessalJ8
IS
clear
Now
continue inserting the
ball bearings
28 Insert
the 22
ball
bearings
Into
the
guIde
tubes
Eleven
ball
bearIngs
should
be Inserted Into
each
tube
29
Carefully
hold the
gu de
tube
and USIng
a
little grease
plug
the open ends
30 POSItIon
the
guIde
tubes
up
to
the
guIde
holes
In
the
ball
nut
31 RefIt the
ball
bearing
gUIde retainIng
clamp
to
the ball
nut
32
If
the
sector
shaft bushes
are to
be renewed
the
old
ones
should
be removed
with
e
drift
Carefully
drift
the
new
bushes
Into
posItIon
SO
that
the
plain
end
of the
lower bush
IS
flush
WIth
the
001 seal
shoulder
In
the
bore
hOUSIng
33 Take
care to ensure
that
the open end of the 011 groove
In
the
bush
IS
facing
the ball
nut
end
NOT
towards
the pItman
arm
If
thIS
IS
not done the
001
seal WIll leak
34 Smear
a
little
grease onto
the
contact
surface
of the
new 0
1
seal end
carefully
fIt
Into
the
main
hOUSing
35 The
bearing
cups and
cones
may
now
be
fItted
to the
column
hOUSIng
and steering gearbox
36 FIt the
worm
shaft
Into
the column
hOUSIng
n Next
fIt
the shIms
and
0
rings to
the
gear
hOUSing
and
secure
the
cover
WIth the three bolts and
spring
washers
3Il Apply
some
001
to
the upper and
lower
bearings
on
the
worm
shaft
39
It
IS now
necessary
to
edJust
the
worm
bearing
pre
oad by
adding
or
subtracting
shIms
to
the
shIm
pack These
shIms
are
avaIlable
In a
range of
thIcknesses
to
enable the correct pre
load
to
be
obtained Ideally
the initIal
torque
readIng
on
the
column
should
be
555
833
In
f
oz
4
6
Kg
f
cm
before
the
sector
shaft
IS
fItted
40 FIt the
backlash
adjustment bolt
to
the slot
In
the sector
shaft and WIth
a
feeler gauge check the
clearance ThIS should
be
00004
00012
In
001
003 mml
ShIms
are
avaIlable
to
obtain
the
correct
clearance
between the head of the bolt and
the
slot
In
the
end of
the
sector
shaft
41
Now
tum
the
worm
shaft
by
hand
untIl
the ball
nut
IS
posItIoned
In
the centra
posItIon
SO as to
allow
the centre tooth
1
19
21
14
FIG
11
45 STEERING ll IKAGE COMPONENTS
1
Locknur
2
Nur
3
Clamp
4
Spllr
pm
5
Nut
6
p lJ
8
8racker
9
Socket
10 Socket
11
Side
rod
12
Socket
DusrcotlBr
14
Sacker
15
S
de rod
16 Dust
eal
17
Cross
rod
assembly
18 Locknut
19
Plam
washer
20
Nut
21
Bolt
22
Idler assembly
23
Lockwasher
24
Nur
2
5
Sreerlng
gear
arm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1968-1973 pl 521 pick-up

Table of Contents