Service Tools; Standard Tools; Solvents And Oils; Error Code - Canon LBP7200Cdn Service Manual

Canon lbp7200 series color laser printer
Hide thumbs Also See for LBP7200Cdn:
Table of Contents

Advertisement

5.2 SERVICE TOOLS

5.2.1 Standard Tools

The table below lists the standard tools required for servicing the printer.
No.
Tool name
1
Tool case
2
Jumper wire
3
Clearance gauge
4
Compression spring scale
5
Phillips screwdriver
6
Phillips screwdriver
7
Phillips screwdriver
8
Phillips screwdriver
9
Flat-blade screwdriver
10
Precision flat-blade screwdriver set
11
Allen wrench set
12
File, fine
13
Allen (hex) screwdriver
14
Diagonal cutting pliers
15
Needle-nose pliers
16
Pliers
17
Retaining ring pliers
18
Crimper
19
Tweezers
20
Ruler
21
Mallet, plastic head
22
Brush
23
Penlight
24
Plastic bottle
25
Lint-free paper
26
Oiler
27
Plastic jar
28
Digital multi-measure

5.2.2 Solvents and Oils

No.
1
Alcohol
2
Grease
3
Lubricant
To clean the external covers, use a cloth moistened with water (well wrung).

5.3 ERROR CODE

5.3.1 Error Code

Code
Detection
E000
Failure in fixing assembly start-up.
If increasing temperature is not detected by main thermistor after current
distribution to the heater is started.
Cause
Open circuit in the main thermistor, disconnection in the fixing heater,
failure in DC controller PCB
Type
Purpose
Cleaning:
Plastic
Rubber
Metal part
Oil stain
Toner stain
Apply between gear and shaft
Apply to gear
T-5-3
Tool No.
Remark
TKN-0001
TKN-0069
With a clip
CK-0057
0.02 to 0.3 mm
CK-0058
0 to 600 g for checking the cassette spring pressure
CK-0101
M4, M5 Length : 363 mm
CK-0104
M3, M4 Length: 155 mm
CK-0105
M4, M5 Length: 191 mm
CK-0106
M4, M5 Length: 85 mm
CK-0111
CK-0114
6-piece set
CK-0151
5-piece set
CK-0161
CK-0170
M4
Length: 107 mm
CK-0201
CK-0202
CK-0203
CK-0205
Applied to the axis ring
CK-0218
CK-0302
CK-0303
Employed to measure 150 mm
CK-0314
CK-0315
CK-0327
CK-0327
100cc
CK-0336
500SH/PKG
CK-0349
30cc
CK-0351
30cc
FY9-2032
T-5-4
- Keep away from flame
- Purchase locally
- SHELL TELLUS 68
(Showa Shell Sekiyu K.K.)
- Tool No. CK-8003
- MOLYKOTE® EM-50L
(Dow Corning Corporation)
- Tool No. HY9-0007
T-5-5
T-5-6
Remedy
Failure in fixing assembly start-up
- Check the connectors of fixing assembly, DC controller PCB, and fixing
power supply
assembly.
- Replace the fixing film unit
- Replace the fixing power unit
- Replace the DC controller PCB
Remark
Chapter 5
0022-0146
0022-0147
0022-0181
5-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents