Mounting and commissioning the machine
8
Commissioning
.02
8
Switching the machine on/off
.03
8 - 4
Fig. 8 - 04
Have qualified personnel check whether the machine can be operated with the available
voltage and whether it is connected properly. If there are any irregularities do not operate
the machine under any circumstances.
Switch the machine on or off (see Chapter 7.01 On/off switch).
Before commissioning the machine
remove plug 1 from the oil tank 2.
1
2
Examine the machine, in particular the
electric cables for any damage.
Clean the machine thoroughly, see also
Chapter 12 Care and Maintenance.
Danger of damage to the
machine!
Plug 1 serves as a safety
device for transportation and
should not be used during
sewing operations.