Sram Init For Factory Test; Sram Init - Tascam DM-24 Service Manual

Digital mixing console
Hide thumbs Also See for DM-24:
Table of Contents

Advertisement

SRAM INIT for Factory TEST

This procedure makes the SRAM available for use on a produc-
tion line.
When you do this, it is absolutely necessary to run the SRAM
INIT procedure before shipment. (Refer to the next item.)
1. When the DM-24 switches into the SRAM INIT for Factory
TEST, the next pop-up message will appear.
2. Press ENTER and the SRAM is initialized to values for use
on a production line. Upon completion of the initialization,
the pop-up message will go out, bringing you back to the
DIAG menu screen with a check mark placed in the corre-
sponding check box.
Pressing a cursor key aborts the initialization.

SRAM INIT

This procedure initializes the SRAM to factory defaults.
CAUTION:
When initializing the SRAM, all setting data except for the
LIBRARY data are cleared. If necessary, make a backup of the
SRAM data, as discussed on page 21.
The LIBRARY data is not cleared because it is on the Flash
ROM.
1. When the DM-24 switches into the SRAM INIT mode, the
following pop-up message will appear.
2. Press ENTER and the SRAM starts being initialized.
Upon completion of the initialization, the pop-up message
will go out, bringing you back to the DIAG menu screen with
a check mark put in the corresponding check box.
Pressing a cursor key cancels the initialization.
17
TASCAM DM-24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents