Fujitsu AU*G36LRLA Design & Technical Manual page 311

Fujitsu 3 phase type single / simultaneous multi system
Hide thumbs Also See for AU*G36LRLA:
Table of Contents

Advertisement

INSTALLING PIPE
Gap of 1.5-2m
Supporter
VP25
[O.D.32mm]
or more
Observe the following procedures to construct centralized drain pipe fittings.
ELECTRICAL WIRING
Control box
Indoor unit
Locally
arranged pipe
VP30 [O.D.38mm]or more
Circuit board
Drain pump wire
(Connector : Blue)
Control box cover
To indoor unit circuit board
- (05-82) -
Rise
Trap
Bad
Drain pump unit
Float switch wire
(Connector : Red)
Air bleeding

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents