Yaroslavl Engine Plant YMZ-536 Operation Manual page 160

Table of Contents

Advertisement

Fixing elements
Timing mechanism
Bolts fixing rocker arm shaft
and supports
Rocker arm adjusting nuts
Fuel equipment fixing
Fuel pump drive gear nut
High pressure injection pump
Rail securing bolts
Bolts fixing injector brackets
in the cylinder head
Nuts attaching the injector's
union to the cylinder head
Nuts attaching the fuel pipes
to the rail and to the injector
union
Fine fuel filter fixing bolts
E.C.U. securing bolts
Cylinder head cover to oil sump fixing
Cylinder head cover fixing
bolts
160
Tightening needed
Preliminary
tightening torque,
Nm (kgf m)
Tightening is performed in three
steps:
1. Preliminary tighten (2–3
revolutions)
2. Start
in
successively moving toward
both sides, tighten to torque of
20–30 Nm (2.0–3.0 kgf·m).
3. Starting from the left end,
successively move to right and
tighten additionally to torque
73.54 ± 4.9 (7.4 ± 0.5)
50 – 55 (5.0 – 5.5)
195 ± 5 (19.5 ± 0.5)
50 – 55 (5.0 – 5.5)
45 ± 2 (4.5 ± 0.2)
16 ± 1 (1.6 ± 0.1)
5 (0.5)
25 + 8 (2.5 + 0.8)
Tighten to maximum torque
in case of fuel leakage
22 – 25 (2.2 – 2.5)
8 – 10 (0.8 – 1.0)
8 – 10 (0.8 – 1.0)
Final tightening
to angle in
degrees or torque
in Nm (kgf m)
the
middle,
95º± 2
55 ± 1 (5.5 ± 0.1)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ymz-5361Ymz-5363Ymz-5364Ymz-5362

Table of Contents