POWR
Mounting bolt 4:
42 N·m (4.2 kgf·m, 30 ft·lb)
Apron and upper case cover bolt:
8 N·m (0.8 kgf·m, 5.8 ft·lb)
5. Install the dipstick guide 7, and connect
the fuel hose 8, PTT motor leads 9,
and flushing device hose (flushing device
model) 0.
5-61
Power unit
PTT motor lead bolt:
4 N·m (0.4 kgf·m, 2.9 ft·lb)
6. Connect the shift cable A and throttle
cable B, and then adjust their lengths.
For adjustment procedures, see Chapter
3, "Checking the throttle link and throttle
cable operation," and "Checking the
gearshift operation."
69J3D11