Rack Mounting Considerations; Ambient Operating Temperature; Reduced Airfl Ow; Mechanical Loading - Supero A+ SERVER 2022TG-HTRF User Manual

Hide thumbs Also See for A+ SERVER 2022TG-HTRF:
Table of Contents

Advertisement

Rack Mounting Considerations

Ambient Operating Temperature

If installed in a closed or multi-unit rack assembly, the ambient operating
temperature of the rack environment may be greater than the ambient temperature
of the room. Therefore, consideration should be given to installing the equipment
in an environment compatible with the manufacturer's maximum rated ambient
temperature (Tmra).

Reduced Airfl ow

Equipment should be mounted into a rack so that the amount of airfl ow required
for safe operation is not compromised.

Mechanical Loading

Equipment should be mounted into a rack so that a hazardous condition does
not arise due to uneven mechanical loading.

Circuit Overloading

Consideration should be given to the connection of the equipment to the
power supply circuitry and the effect that any possible overloading of circuits
might have on overcurrent protection and power supply wiring. Appropriate
consideration of equipment nameplate ratings should be used when addressing
this concern.

Reliable Ground

A reliable ground must be maintained at all times. To ensure this, the rack
itself should be grounded. Particular attention should be given to power
supply connections other than the direct connections to the branch circuit (i.e.
the use of power strips, etc.).
Chapter 2: Server Installation
2-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

A+ server 2022tg-hibqrf

Table of Contents