2-Stroke Installation - Hangar 9 Twin Otter ARF Assembly Manual

Table of Contents

Advertisement

Step 6
Use the holes in the cowling to drill mounting holes
in the nacelle using a pin vise and 1/16-inch drill bit.
Remove the cowling and apply a small drop of thin CA
to each of the mounting holes in the nacelle. Allow the
CA to cure without using accelerator.
Step 7
Use a 5/64-inch drill bit in a pin vise to enlarge the
mounting holes in the cowling.
Twin Otter ARF Assembly Manual
Step 8
Use a #1 Phillips screwdriver to install the cowling
with four #2 x 1/4-inch woodscrews.
Step 9
Slide the prop adapter onto the motor shaft then install
the spinner backplate and propeller. Use the shaft of
a hex wrench to tighten the propeller nut. Secure the
spinner cone using a #1 Phillips screwdriver and the
screws provided with the spinner.

2-Stroke Installation

Parts Required
Wing panels (left and right)
Micro servos with hardware (2)
9-inch servo extension leads (2)
Engines (2)
Radio
Throttle pushrods (2)
Clevises (2)
Silicone keepers (2)
Engine Mounts (2 sets)
Fuel tanks (2)
Hook and loop strap (2)
Cowlings (2)
Firewall drilling template
#4 steel washers (16)
#8 steel washers (8)
6-32 blind nuts (8)
4-40 nylon lock nuts (8)
4-40 x 1-inch Allen head machine screws (8)
6-32 x 1-inch Allen head machine screws (8)
Tools Required
Ruler
Pencil
Felt-tipped pen
#1 Phillips screwdriver
Pliers
Drill motor
Tapered reamer
Thin CA
3/32-inch hex wrench
7/64-inch hex wrench
Round file
Low-tack tape
Dental floss
Threadlock
Sidecutters
Needle-nose pliers
1/4-inch wrench
Drill bits: 1/16, 11/64, 5/16-inch
Rotary tool with cutoff wheel and drum sander
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents