Ltu Series Specifications; Ltu Series Packing List - Space-Ray LTU80-N5 Installation And Operation Instructions Manual

Space-ray infrared radiant tube heater single stage pull through system (negative pressure) ltu series/lts series
Table of Contents

Advertisement

6.0)

LTU SERIES SPECIFICATIONS

Btu/hr
Model No.
Input
LTU 80
80,000
1-1/2"
LTU 90
90,000
1-1/2"
LTU 100
100,000
1-5/8"
LTU 110
110,000
1-3/4"
LTU 120
120,000
1-3/4"
LTU 125
125,000
1-7/8"
LTU 130
130,000
1-7/8"
LTU 140
140,000
2-1/32"
LTU 150
150,000
2-1/32"
LTU 160
160,000
2-1/4"
LTU 175
175,000
2-1/4"
LTU 180
180,000
2-1/4"
LTU 200
200,000
2-3/8"
LTU 225
225,000
2-1/2"
LTU 250
250,000
2-3/4"
* MOUNT HEATERS AS HIGH AS POSSIBLE. Minimums are shown as a guideline for human comfort and uniform
energy distribution for complete building heating applications. Consult your Space-Ray representative for the
particulars of your installation requirements.
Type
Gas Pipe
Gas
Connection
Natural
½" MPT
or Propane
LTU 225 and 250 require a minimum 3/4" nominal ID flexible gas connector.
1
LTU 180-250: 6" round. See Section 17.0) for vent sizes and limitations.
2
In-line: 2 Amp 250V
(for 24V Circuit)
7.0)

LTU SERIES PACKING LIST

A. Control/Draft Inducer Package
Part Description
Control Box Assembly .............................................................................................................................. 1
Draft Inducer & Junction Box Assembly ................................................................................................ 1
Flue Restrictor Plate (See Section 6.0) for plate I.D. and part no.) ................................................... 1
4" x 6" Starting Collar
Control Fastener Kit (#42907010) ....................................................................................................... 1
Containing: #8-32 Screws & Nuts (#02166010 & #02127030) .......................................... 2
Tube Flange Gasket (#42921000) ...................................................................................................... 2
Installation & Operation Instructions (#43155010) .......................................................................... 1
Gas connector, 5/8" OD x 36" (#30302360)
4-inch Starting Collar (#40504020) supplied with LTU 80-175 models.
1
LTU 225 and 250 models using Gas Connector, 1" OD x 36" (#30302361)
2
Flue Restrictor Plate
I.D. & Part #
#42741050
#42741050
#42741060
#42741070
#42741070
#42741080
#42741080
#42741090
#42741090
#42741100
#42741100
#42741100
#42741130
#42741140
#42741150
Tube
Diameter
1
(Male)
4"
Fuse Rating:
Spark Module: 3 Amp 250V
(for 24V Circuit)
(#42892009) Supplied with LTU 180-250................................................. 1
1
¼ - 20 Locknuts (#02167010) .............................................................................. 6
Orifice Size
Natural Gas
Propane Gas
#19
(0.166)
#38
#16
(0.177)
#36
#14
(0.182)
#33
#10
(0.194)
#31
13/64
(0.203)
1/8
#5
(0.206)
#30
#4
(0.209)
3.3mm
5.5mm
(0.216)
#29
5.7mm
(0.224)
#28
5.8mm
(0.228)
#27
"C"
(0.242)
3.8mm
"C"
(0.242)
#24
"F"
(0.257)
#21
6.9mm
(0.272)
#18
"K"
(0.281)
4.5mm
Flue
Fresh Air
Connection
Connection
2
4" Round
6" Round
Ignition System (direct spark):
30 second pre-purge period
................................................................................... 1
2
-6-
Minimum *
Mounting Height
@
Horizontal
(0.102)
13 ft.
(0.106)
13 ft.
(0.113)
13 ft.
(0.120)
14 ft.
(0.125)
14 ft.
(0.129)
14 ft.
(0.130)
14 ft.
(0.136)
15 ft.
(0.140)
15 ft.
(0.144)
15 ft.
(0.150)
15 ft.
(0.152)
18 ft.
(0.159)
18 ft.
(0.170)
20 ft.
(0.177)
20 ft.
Electrical
Current
Supply
Rating
120 Volt, 60Hz,
1 Phase
2.6 Amp
QTY
Form #43155010
@
45º Angle
12 ft.
12 ft.
12 ft.
13 ft.
13 ft.
13 ft.
13 ft.
14 ft.
14 ft.
14 ft.
14 ft.
17 ft.
17 ft.
19 ft.
19 ft.
Mar 09

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents