LTS 180-250 SERIES HEATER ASSEMBLY OVERVIEW

11.4)

LTS SERIES HEATER ASSEMBLY

During field assembly of the LTS series heater body sections, the recommended procedure is as follows:
1. Before hanging heater sections, first determine the actual layout of the system (see Sections 11.0) & 11.1)
for details). Consideration must also be taken for flue pipe, fresh air ducting, gas piping, clearances to
combustibles, etc. before hanging heater.
2. Put the suspension in place using proper suspension method (see Section 5.0).
3. Hang each tube section individually. Observe the following requirements.
a) DO NOT attach the heater tube sections together on the ground and attempt to hang the entire system.
The weight of the individual heater body sections can cause misalignment and damage to the heater.
b) DO NOT relocate the tube support/hanger brackets, especially at the control end of the heater.
c) For LTS40-200 Models, the first tube section MUST be a 10 ft. tube with one 24-hole flange which is to
mount control box.
d) For LTS225-250 Models, the first tube section MUST be a 10 ft. tube with two 6-hole flanges.
e) For all LTS models, the last tube section MUST be an either 10 ft. or 5 ft. tube with one 24-hole flange
which is to mount draft inducer.
f)
Failure to attach the control box to the flange end as indicated above will void the manufacturer's
warranty.
g)
Any S hook used in suspension should be crimped close.
Models: LTS 180-200
Models: LTS 225-250
-22-
Form #43155010
Mar 09

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents