Lts Series - Adding Optional 90º Elbow - Space-Ray LTU80-N5 Installation And Operation Instructions Manual

Space-ray infrared radiant tube heater single stage pull through system (negative pressure) ltu series/lts series
Table of Contents

Advertisement

5. For LTS225-250 Models, join the first two body sections as illustrated below.
a) Join the tube flanges of the body sections together with the gasket in between. Loosely attach the
heater body sections together with the ¼-20 screws and locknuts provided. DO NOT fully tighten the
screws and locknuts yet!
b) Tighten the screws and locknuts using the sequence shown. The screws and locknuts should be
tightened a little bit at a time (the same way you would secure the lug nuts to a car wheel).
6. Assemble reflectors onto the body section. Refer to the instructions described in Sections 8.5) and 11.2).
11.5)
LTS SERIES - ADDING OPTIONAL 90º ELBOW
1. The optional 90º elbow must be located a minimum of 10 ft. after the control box.
2. Hang the body sections in a 90º ("L") shaped pattern. Allow spacing for the elbow. The distance from one
end of the elbow to the centerline of the opposite leg is 13" as shown.
3. Join the tube ends of the body sections and the elbow together and secure with tube couplings as described
in Section 11.4).
The reflector clamps MUST be installed per reflector
clamp installation detail which allows the reflector to
slide under the clamp during heater operation.
-24-
Form #43155010
Mar 09

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents