Checking The Serverboard Setup; Installing The Server Into A Telco Rack - Supero SUPERSERVER 1026T-URF4+ User Manual

Table of Contents

Advertisement

S
S
UPER
ERVER 1026T-URF4+ User's Manual

Installing the Server into a Telco Rack

To install the chassis into a Telco type rack, use two L-shaped brackets on either
side of the chassis (four total). First, determine how far the server will extend out the
front of the rack. Larger chassis should be positioned to balance the weight between
front and back. If a bezel is included on your server, remove it. Then attach the two
front brackets to each side of the chassis, then the two rear brackets positioned with
just enough space to accommodate the width of the telco rack. Finish by sliding the
chassis into the rack and tightening the brackets to the rack.
Figure 2-5. Installing the Server into a Telco Rack
2-5

Checking the Serverboard Setup

After you install the system in the rack, you will need to open the top cover to
make sure the serverboard is properly installed and all the connections have been
made.
Accessing the Inside of the System
1. First, grasp the two handles on either side and pull the system straight out
until it locks (you will hear a "click").
2. Next, release the thumbscrew at the middle rear of the top cover. Then press
the two buttons on the top of the chassis to release the top cover.
2-8