Place Of Installation - GE Digital Energy LP 33 Operating Manual

10 – 20 – 30 kva series 4
Hide thumbs Also See for Digital Energy LP 33:
Table of Contents

Advertisement

g
4.4

PLACE OF INSTALLATION

The UPS should be installed in a restricted area where only qualified personnel should be
admitted.
The place of installation should be clean, dust-free, and provided with proper ventilation or air-
conditioning.
Verify for sufficient floor load capacity (see Section 4.1.1).
We strongly advice that the ambient temperature should not exceed 20°÷25°C / 68°÷77°F (max.
35°C / 95°F).
See Section 4.5.
NOTE !
Insufficient space on both sides of the UPS in respect to the wall can cause a
dangerous increase of the internal operating temperature.
Fig. 4.4-1 LP 33 positioning
Fig. 4.4-2 RPA parallel system positioning
NOTE !
Operating temperature is very important for valve regulated battery
(maintenance free).
Operation at temperatures higher than 20°C (68°F) will reduce life expectancy.
Respect the prescription VDE 0510, those of the battery supplier and other
local standards.
The installation and cabling of the battery must be done by qualified people.
OPM_LPS_33E_10K_30K_4CN_V010.doc
LP 33 positioning
For easier access in case of maintenance
operation and for a free circulation around the
cabinet, we recommend to maintain the
following minimum distances:
Right & left side:
Rear side:
Top of the UPS:
Right & left side:
Rear side:
Top of the UPS:
NOTE !
Both lateral sides of the UPS MUST BE
ACCESSIBLE at any time for repair or
maintenance.
Operating Manual LP 33 / 10-20-30 kVA
22/82
GE
100 mm (4")
50 mm (2")
300 mm (12")
200 mm (8")
50 mm (2")
300 mm (12")

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents