g
4.
Switch On the output switch Q1 (Pos. I).
The output will be supplied by the mains through the
bypass.
Verify, selecting the screen METERING/Udcp and Udcn,
that the booster voltage has reached about 400 VDC.
5.
Switch On the inverter entering the screen:
MENU/COMMAND MENU/INVERTER ON
Some seconds later the load will be transferred on inverter
and the main screen will display: APPLICATION ON UPS
6.
Operation mode selection.
LP 33 is delivered normally selected for permanent On-line operation.
IEM mode can be enabled and the IEM START time & IEM STOP time can be programmed
for each day of the week (see Section 7.3.1-5).
NOTE !
Even if the UPS is delivered with the battery fully charged, they could be
partially discharged during transportation or storage.
It is recommended to recharge the battery during a few hours in order to
provide the complete battery energy stored to the load in the event of mains
failure.
OPM_LPS_33E_10K_30K_4CN_V010.doc
Udcp=400V
>
APPLICATION ON UPS
Operating Manual LP 33 / 10-20-30 kVA
57/82
LP 33
20kVA
APPLICAT. ON UTILITY
Udc Voltage
Udcn=400V
INVERTER ON
‫٭‬
INVERTER OFF
LP 33
20kVA
GE